// Case study

GMHBA Stadium
Kardinia Park Stadium Trust

•

Geelong, VIC

•

2023

BuildLens partnered with DUO PROJECTS, Kardinia Park Stadium Trust and Besix Watpac to document the 30-month construction of the Joel Selwood Stand at GMHBA Stadium, from demolition of the old stand through to completion. Two long-term time-lapse cameras captured the full build progression — including all 15 individual roof modules being crane-lifted into place , shooting at 1 frame every 10 seconds,, creating standout time-lapse sequences of the stand taking shape. Short-term time-lapse coverage captured additional key milestones, while regular timelapse movies were made available to news outlets for updates. Drone photography and videography added elevated perspectives, and imagery throughout supported stakeholder engagement with fans, partners and the community.

Role

Full documentation partner

Capture window

30 Months

Deliverables

Monthly time-lapse edit, drone stills, ground archive

Services used

Ground photographyLong term Time-lapse photographyFinal / completion hero photographyVideographyStakeholder engagement

GMHBA Stadium
Before / After

GMHBA Stadium
Geelong, VIC

// The work

Other case studies.

2024

Barwon Heads Road Upgrade

Barwon Heads, VIC
2025

New Footscray Hospital

Footscray, VIC
2024

36 Wellington

Collingwood, VIC
2022

308 Exhibition

Melbourne, VIC
2026

Airtrunk Data Centres

Derrimut, VIC
Top