// Case study
•
•
BuildLens documented the 24-month construction of T3 Collingwood at 36 Wellington Street for Hines and Sumitomo Forestry, working alongside builder Icon on Australia’s tallest timber structure and Hines’ first Australian development. Two long-term time-lapse cameras tracked the build’s progression, capturing the distinctive staged construction of concrete podium levels giving way to exposed glulam post-and-beam structure with CLT floor panels rising above. Drone photography and videography documented key project milestones, showcasing the scale and precision of the mass timber construction process from multiple perspectives. On completion, final hero photography captured the finished tower, delivering polished imagery for marketing and leasing use. The project stands as a landmark for Australian construction and for Hines’ entry into the local market – a next-generation sustainable commercial tower that set a new benchmark for mass timber building in this country.
Role
Capture window
Deliverables
Services used
36 Wellington, Collingwood, VIC
Final presentation summary video
// The work
Other case studies.